Skip to content

Plan your build around the weather. Consultations at (704) 753-8229

Gastonia · Dallas · Bessemer City · Ranlo

(704) 753-8229

Custom home builder services in Gastonia, NC

Custom home building, home remodeling, land clearing, grading, foundation work, flooring installation and siding installation for homes in Gastonia and the towns around it.

Builder carrying rolled plans points across a graded dirt lot with pink-flagged stakes as a couple walks beside him, brick ranch homes and a small excavator behind
  • Two-story wood-framed house wrapped in white house wrap with black windows, a worker on the shingled roof, ladder, sawhorses and lumber on a dirt lot in a neighborhood

    Custom Home Building

    Custom homes built on your land, with site work, foundation and framing scheduled by season so the house is dried in before the weather turns.

  • Carpenter in a cap and khaki work pants positioning a white shaker base cabinet in a kitchen with patched bare walls and worn old flooring exposed

    Home Remodeling

    Kitchens, baths, opened floor plans and room additions, with exterior work planned for mild weather and interior finish work for the hot and cold months.

  • Yellow compact track loader on a freshly cleared dirt lot with tree stumps and brush piles, brick ranch house and two-story home behind the trees

    Land Clearing

    We clear trees, brush and stumps from your lot and leave stable, protected ground that is ready for grading and a foundation.

  • Worker rakes red clay soil smooth beside a compact track loader in front of a new house wrapped in house wrap, with a brick home in the background

    Grading

    Rough and finish grading that shapes your lot so rain drains away from the house, prepared before the wettest months arrive.

  • Two workers in rubber boots spread and screed wet concrete over a rebar grid inside wooden forms on a red clay lot, with plumbing stubs and brick homes behind

    Foundation Work

    New footings, slabs and crawl space walls for custom homes and additions, plus careful assessment of settling in existing foundations.

  • Installer kneeling on a concrete subfloor, tapping wide wood-look planks into place with a rubber mallet in an empty room with a kitchen behind

    Flooring Installation

    Hardwood, engineered wood, tile and vinyl plank installed over a tested, level subfloor, timed so the boards settle well through the seasons.

  • Worker on an extension ladder nailing green board-and-batten siding onto a house wall, with white house wrap and a window still exposed beside him

    Siding Installation

    New vinyl, fiber cement or engineered wood siding over a sound, properly flashed wall, scheduled for the weeks when materials install best.

New two-story white brick home with board-and-batten gables, black windows lit from inside, a wood-post front porch, a curved concrete driveway and a fresh sod lawn at dusk

Plan Your Project for the Right Season

A short conversation now can save weeks of weather delays later. Tell us what you have in mind and we will help you map out when each phase should happen.